On March 12, Iron Maiden were dealt a heavy blow when their custom Boeing 747-400 jumbo jet Ed Force One was badly damaged in a ground accident in Santiago, Chile. Two of the jet's engines were partially torn apart, leaving the band and their crew to scramble as they secured alternate means of transportation and kept the tour right on course. Thankfully, Maiden have provided an update revealing the jet has been repaired and will be rejoining the band as they continue to support The Book of Souls worldwide.

Working with Air Atlanta, the company Maiden leases the plane from, and Boeing, teams converged immediately to lay out the daunting details involved in replacing two $4 million engines as the Ed Force One remained in Chile. Technicians were flown in from Iceland and Saudi Arabia where they repaired the damage as the parts arrived after being transported over 7,000 miles. The work was done around the clock as the crew feverishly restored the plane to its rightful glory.

Iron Maiden posted a lengthy statement on their Facebook page, as they've been unprecedentedly active across all their social media channels on this tour. The statement reads:

ED FORCE ONE ONWARDS AND UPWARDS AGAIN
MAIDEN PLANE SET TO REJOIN THE BOOK OF SOULS TOUR IN BRASILIA TOMORROW AFTER MASSIVE REPAIRS COMPLETED IN JUST 10 DAYS
TWO 5000kg, FOUR MILLION DOLLAR JET ENGINES FLOWN 12,000 KM TO REPLACE DAMAGED ENGINES
Following the major accident in Chile (link to previous release on this) on the morning of Saturday March 12, we are delighted to announce that a fully repaired Ed Force One will take off tomorrow afternoon, Tuesday March 22, from Santiago Airport to rejoin the tour at Brasília Presidente Juscelino Kubitschek International Airport. Following the show at Nilsen Nelson Arena, the plane will be loaded up once again on Wednesday with over 20 tons of equipment and our tour personnel to fly to Fortaleza for the concert on Thursday and on from there to Sao Paulo then New York and onwards round the World on The Book of Souls World Tour which visits 36 countries in the five month period.
The accident required the replacing of both of the Boeing 747’s port side jet engines, a tough proposition at the best of times but not made any easier by the fact of the distances involved in getting such huge components, parts, tools and technical crew to Chile as quickly as possible to get Ed Force One back in the air. The engines alone weigh 5000kg each, and cost around four million dollars each.
Ed Force One is leased from Air Atlanta who went into immediate action following the incident, with technical assistance from Boeing. An emergency meeting on the Sunday was called to create a comprehensive detailed plan for this complex operation – locating suitable engines, thrust reversers, cowlings and parts, working out necessary tooling and technical team, logistics of ground and freight transport and tech team travel and a myriad of other detail. All from scratch. The next couple of days were spent putting these plans meticulously into place
The result was that on Thursday last, March 17, a Cargolux chartered 747 freighter left Luxembourg carrying two huge replacement jet engines, trucked there from Hannover, Germany. The Charter stopped over at Stansted Airport, Essex, UK to collect two more consignments. Cowlings and thrust reversers were trucked there in huge boxes from Kemble, UK, along with tooling and consumables flown in specially from Jeddah to Heathrow and hauled to Stansted.
The chartered 747 then completed the 12,000km (7410 miles) flight to Santiago , arriving at 9am Friday morning. The technicians were flown there from Iceland and from Atlanta Air’s base in Jeddah, Saudi Arabia, six in total, to join with EF1’s own two onboard techs, Bjorn Bjarnason and Sigurbjarni ( Barney) Thormundsson, and Jeremy Smith of Rock It Cargo Ltd, who is on tour with us supervising the freight and customs aspects.
The engines were cleared by Chilean Customs Friday lunchtime and they were transferred to the LAN Chile maintenance area of the airport arriving just before 2pm. Working in shifts 24 hours a day the techs were then able to start removing Engine number 1 and then on Saturday Engine number 2. Using hoists and cranes the damaged engines had to be detached then lowered into a cradle in order to swap with the new replacement engines. The replacement engines were then lifted up and into a place. Once the support pylons had been inspected and x-rayed and damage assessed, both of which passed with flying colours, then the new engines were attached with, as one of the techs said, a ' million' wires. Both were finally in place and attached by Sunday lunchtime and then the thrust reversers fitted overnight, almost as complex an operation as fitting the actual engines due to being right under the wing. Final piece of the jigsaw was for the Eddie decals to be fitted and then both engines tested by running to full power.
Comments Bruce Dickinson, Maiden vocalist and pilot of Ed Force One : 'The speed and thoroughness of this incredibly complex operation was stunning and we are so very pleased to get our plane back! We would like to thank Air Atlanta and their terrific rescue team for a fantastic effort in achieving this in the time they did, and to Boeing, LAN Chile. ACS and Rock It Cargo for all their invaluable support. We are sorry though for our fans in Cordoba, Buenos Aires, Rio and Belo Horizonte who missed out seeing the plane, but we hope they enjoyed the concerts as much as we did.
We should also thank our Killer Krew who found themselves at lunchtime on the Saturday of the accident with over 20 tons of equipment at the airport in Santiago and over 60 people all to get to Cordoba for early the next day to set up the huge show we are carrying. The distance is “only” 1000km, but with a small matter of the Andes in between! They did it , by the skin of the teeth, and all went very well for the show in Cordoba and the other cities EF1 just missed. It’s quite a feat of logistics to find and put into action at such short notice all the transport, replacement air-charters, schedule flights etcetera to enable us to play those next four shows on time without EF1, our transport for everything. Great effort, team, many thanks from all of us. And to our promoter MOVE and ACS for all their assistance and time with this too.'

As stated, Ed Force One will be taking off tomorrow (March 22), rejoining the band in Brazil. The plane was a necessary update from the two previous incarnations Iron Maiden has used on past tours. With 20 tons of cargo to transport, a larger plane was needed and was custom-rigged to haul the equipment, band and crew as they will work their way through 35 countries by the time the tour concludes. Photos of the repair work can be seen below, but for the full picture set, visit Iron Maiden's Facebook page.

Ed Force One Being Repaired

Facebook: Iron Maiden
Facebook: Iron Maiden
loading...
Facebook: Iron Maiden
Facebook: Iron Maiden
loading...

10 Greatest Iron Maiden Onstage Eddies

See Where Iron Maiden's Albums Landed on the Top 80 Hard Rock + Metal Albums of the 1980s

More From The Basin's Classic Rock